POSITION : Home > News > Details

Hydraulic breaker/hammer gas charging procedure


2011-04-23  Form:http://www.ylfpart.com
Key words:Hydraulic breaker,hydraulic hammer
Digest:
Hydraulic breaker/hammer gas charging procedure
1. Check that the nitrogen gas bottle valve is closed of Hydraulic breaker/hammer;

2. Connect the high pressure hose to the hydraulic hammer nitrogen gas bottle;

3. Connect the high pressure hose to the charging valve;

4. Inspecting the gas pressure;

5. Turn the gas bottle valve wheel clockwise to allow gas to enter the hose;

6. Turn the charging valve wheel to allow the gas to pressurize the accumulator chamber;

7. Pay close attention to the gauge so the seals are not stretched by application of excessive gas pressure(DO NOT EXCEED THE MAXIMUM GAS PRESSURE DURING CHARGING);

8. Turn the charging valve wheel counterclockwise to prevent any more gas entering the hydraulic breaker;

9. Turn the release valve counterclockwise to relieve gas in the high pressure hose;

10. Disconnect the charging valve from adapter;

11. Install adapter cap on to adapter of hydraulic hammer.